Is your transit or metro railway experiencing accelerated wheel or rail wear? WID’s new TBOGI-TR system combines innovation and expertise to deliver the solution you need. We will be presenting our latest technology at WRI 2020 in Vancouver.

Cut the cycle of repeat defects, and optimize the wheel-rail interface with TBOGI:

  • Wheels: Are any wheels wearing out asymmetrically and/or too quickly?
  • Rail: Does the rail exhibit any rolling contact fatigue, or any gauge corner wear, cracking or shelling?

If any of these conditions exist, TBOGI can offer significant savings:

  • 50% less wheel wear
  • 50% less rail wear
  • 10% reduction in fuel/energy consumption

Installed next to the tracks, TBOGI measures the geometry and stability of each wheelset and bogie: keys to a cost-effective wheel-rail interface.

Meet us at WRI in September, if it is safe for the event to proceed.

20, rue de la Cooperative
Rigaud, QC J0P 1P0, Canada
Phone: +1 450 206 0681

info@wid.ca      |      www.wid.ca

20, rue de la Cooperative
Rigaud, QC J0P 1P0, Canada
Phone: +1 450 206 0681

info@wid.ca   |   www.wid.ca