Is your transit or metro railway experiencing accelerated wheel or rail wear? WID’s new TBOGI-TR system combines innovation and expertise to deliver the solution you need. 

Cut the cycle of repeat defects, and optimize the wheel-rail interface with TBOGI:

  • Wheels: Are any wheels wearing out asymmetrically (thin flanges or hollowing)? Are any wheels wearing out quickly, either during or at the end of their lifespan?
  • Rail: Does the rail exhibit any rolling contact fatigue, or any gauge corner wear, cracking or shelling, or material flow?

If any of these conditions exist, TBOGI can offer significant savings:

  • 50% less wheel wear
  • 50% less rail wear
  • 10% reduction in fuel/energy consumption

Installed next to the tracks, TBOGI measures the geometry and stability of each wheelset and bogie: keys to a cost-effective wheel-rail interface.

Don’t let performance and savings fall by the wayside! Find out how your railway can benefit from TBOGI-HD and TBOGI-TR.

Don’t wait for next year. Contact us today.

20, rue de la Cooperative
Rigaud, QC J0P 1P0, Canada
Phone: +1 450 206 0681

info@wid.ca      |      www.wid.ca

20, rue de la Cooperative
Rigaud, QC J0P 1P0, Canada
Phone: +1 450 206 0681

info@wid.ca   |   www.wid.ca